Nanle Waste Water Anti-freezing Protection

Industrial enterprises need to discharge a large amount of wastewater during the production process, and the wastewater flows through pipelines to the discharge point for treatment. However, in winter, the low temperature will cause waste water in the pipeline frozen and impossible to discharge.


 One common method is to use a heating cable system to keep pipes warm enough to prevent freezing. AntTec successfully won the bid of Nanle Sewage Treatment Plant Anti-Frozen Project and supplied over 10,000 meters self-regulating cables. This electric heating system has been working properly for more than 3 years and no frozen since then.